Home · Knowledge · How to Order a Custom Roll Forming Machine: Step-by-Step Process

How to Order a Custom Roll Forming Machine: Step-by-Step Process

RollForm Team · 2026-10-22 · Tags: order-process, custom, buying-guide

Ordering a custom roll forming machine doesn’t have to be complicated.

This guide walks you through the typical process when you work with a Chinese manufacturer like ZT RollForm Machine.

Step 1: Send your profile drawing

The more information you provide, the more accurate the quote:

  • Profile drawing (DWG, DXF, PDF, or even a hand sketch)
  • Material type and thickness range (e.g. galvanized steel 1.0–2.0 mm)
  • Required production speed (meters per minute)
  • Coil inner diameter and max coil weight
  • Output length tolerance and cut-off method (flying cut or post-cut)
  • Your local voltage and phase (e.g. 380V 50Hz 3-phase, 220V 60Hz single-phase)

Tip: If you have a sample profile, ship it to the factory. Physical samples prevent 90% of misunderstandings.

Step 2: Technical proposal & quotation

Within 2–3 working days, you’ll receive:

  • A machine layout drawing showing decoiler, roll former, cutter, runout table
  • A list of main components (brand of PLC, VFD, bearings, hydraulic pump)
  • FOB price, lead time, payment terms (typically 30% T/T deposit + 70% before shipment)
  • Warranty terms (standard 12 months after commissioning)

Step 3: Design confirmation

After you accept the quote:

  • The engineering team produces detailed assembly drawings
  • You review and sign off on the design
  • Any modifications are made before manufacturing starts

Step 4: Manufacturing (30–45 days)

Typical production timeline:

Week Activity
1–2 Material preparation, cutting, welding frame
3–4 Machining roll shafts, gearbox assembly
5–6 Roll tool design & CNC machining
7 Electrical wiring, PLC programming
8 Factory test run with your sample material

Step 5: Factory Acceptance Test (FAT)

Before shipping:

  • The factory runs the machine with your sample steel coil
  • You receive video and photos of the test run
  • You can send your own technician or hire a third-party inspector (like SGS)

Step 6: Shipping & installation

  • The machine is loaded in a 40HQ container (standard line size)
  • Installation manual, electrical schematic, and operation video are included
  • Remote video guidance is provided for commissioning
  • On-site installation support available on request

What to ask before you sign

  • What’s included in the price? (decoiler, runout table, tooling spares?)
  • How long does tooling changes take? (quick-change cassettes vs. manual)
  • Do you provide English operation manuals?
  • What’s the response time for spare parts?
  • Can you customize the control panel to our language?

Typical lead time summary

Machine type Lead time
Standard C/Z purlin line 30–35 days
Custom roof sheet line 35–45 days
Double-layer combined line 40–50 days
Fully automatic with stacker 50–60 days